From: route@monster.com
Sent: Tuesday, December 01, 2015 2:33 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Primavera P6
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
DAVID J. CANNON 18724
Hwy
157
(706) 398-7298 Home Menlo,
GA
30731
email:
davidcannon@hotmail.com
(423) 316-3504 Cell EDUCATION BS
Business Administration Trident University Attended
University of Tennessee at Chattanooga
Position
Sought: Project Controls/Cost and
Schedule
EXPERIENCE:
Twenty-Five years in Planning/Scheduling, Field Engineering and Quality
Control. United
States Human Resource Command 9/97-Present
US Army Accession Command, Fort Knox, KY.
Project
Control Engineer - Responsible for implementing a cost and
scheduling
system
for several software development projects. Trained engineers in Project Management
concepts, including scheduling and earned value. Participated in CMMI
Assessments. Developed variance analysis on major software project. Onsite
Engineering
6/97-9/97
PSE&G Salem Unit 1, Hancocks Bridge,NJ.
Project Control Engineer - System Scheduler responsible for developing
network
logic for assigned systems, analyzing critical path, status work progress and
coding activities to the proper plant milestones. Raytheon
Engineers and Constructors
2/97-5/97
Washington Public Power Supply System, Richland,
WA.
Project Control Engineer - Responsible for outage scheduling and daily
updates
and logic changes in the P3 outage network. Interfaced with craft and
supervisors
to obtain progress and revisions to the work activities. Automated
Sciences Group/CACI
3/95-11/96
Department of Energy, Portsmouth Plant, Piketon, OH Project Analyst - Responsible for
analyzing cost by WBS/Project. Interfacing with subcontractors on planned
expenditures, baseline management, funds management, reviewing estimates and
reporting performance to DOE. Westinghouse
Savannah River
3/92-3/95
Department of Energy, Aiken, SC Project Control
Engineer -
Developed schedules for Environmental Restoration Projects. Monitored cost by
WBS and met with DOE-HQ officials at regional meetings to explain status of
Technology Demonstration Projects. Provided
baseline management and funds management principles using Primavera, Excel
spreadsheets and Excel graphics. Responsible for providing direction in developing a
Site Integrated Scheduling System. Developed a database to track and report
to DOE on all site
milestones.
DAVID J. CANNON Raytheon Engineers
and Constructors
11/91-3/92
LaSalle Nuclear Station, Marseilles, IL Project Control
Engineer
- Responsible for all electrical upgrade modifications. Responsible for
leading electrical turnover meetings, statusing schedules, correcting logic
errors in the plant outage schedule. Conveyed electrical status to the
Utility representative at daily outage status meetings. Raytheon
Engineers and Constructors 9/91-11/91
Knoxville, TN. Project Control
Engineer -
Developed detailed schedules for major chemical plant upgrades. Monitored
cost by WBS. 4/90-9/91
Savannah River Site, Aiken , SC Project Control
Engineer
- Responsible for developing integrated schedules and spend-out plans.
Monitored project cost and performed an analysis of performance measurement. Tennessee
Valley Authority 4/89-4/90
Watts Bar Nuclear Plant, Spring City, TN. Project Control
Specialist
- Responsible for preparing detail schedules for major electrical projects.
Monitored cost, units, and man-hours. Prepared charts/graphs and other visual
aids for daily progress meetings. Performed walkdowns to determine
construction status. Coordinated with craft supervision regarding field
conditions, quantities, man-hours and potential schedule impacts. 6/87-4/89
Browns Ferry Nuclear Plant, Athens, AL. Field Construction
Specialist
- Reviewed outstanding modifications for adherence to site requirements.
Verified implementation of ECN's and updated configuration control program.
Reviewed and updated site procedures for compliance with TVA and NRC
requirements. Responsible for monitoring work activities to present
recommendations to management on to increase efficiency of the work process. Butler
Service Group 1983-1986
Vogtle Nuclear Plant, Waynesboro, GA. Electrical Lead
Inspector
- Provided work direction to ten inspectors in the areas of Electrical
hangers, conduit, and cable installation. Lincoln
Technical Services 5/83-10/83
Midland Nuclear Plant, Midland, MI. Electrical
Inspector
- Inspected conduit, conduit supports, cable tray and cable tray supports.
Reviewed inspection reports for completeness and accuracy. Tennessee
Valley Authority 1978-1983
Bellefonte Nuclear Plant, Hollywood, AL. Electrical
Engineering Associate - Responsible for inspecting electrical installations
and performing periodic maintenance. Served as Material Expediter responsible
for maintaining an adequate stock of common electrical items. Initiated
Purchase Requests while interfacing with vendors on price and delivery dates. |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|